Open Pit Mine Planning

Summary

Understanding mine planning processes

Schedule

This 2-day course presents basic open pit planning considerations; including technical design and optimisation to scheduling concept.

AusIMM PD Hours

16

Course Content

You will learn about:

  • The mine planning process, from optimisation to scheduling and the challenge of optimising mine schedules
  • Practical advice on open pit mine design
  • Open pit optimisation - Lerchs-Grossman optimisation software and its use
  • Slope stability for mines and dumps – geotechnical, hydrogeology and hydrology issues
  • Practical and theoretical open pit design – including ramp replacement and design
Course Length (Days)
2

Show the next months in

Level 1, 130 Stirling Street Perth Australia 6000
Level 1, 130 Stirling Street Perth Australia 6000
Level 1, 130 Stirling Street Perth Australia 6000
Location Dates Price exc. Taxes   Status
Perth 10 – 11 Apr 3,380.00 AUD

Perth

10 – 11 Apr

3,380.00 AUD exc. Taxes

 

Register Now »
Perth 07 – 08 Aug 3,380.00 AUD

Perth

07 – 08 Aug

3,380.00 AUD exc. Taxes

 

Register Now »
Perth 06 – 07 Nov 3,380.00 AUD

Perth

06 – 07 Nov

3,380.00 AUD exc. Taxes

 

Register Now »
There are no future events scheduled at this time.