Mining for Non-Miners

Summary

An introduction to the mining cycle

Schedule

This 1-day course explains the basic mining cycle for open pit and underground mines, the planning process, including feasibility studies and cost drivers behind successful mines.

AusIMM PD Hours

8

Course Content

You will learn about:

  • The mining cycle; the stages in the life of a mine, from exploration through to mine closure and rehabilitation
  • Underground mining
    • Development
    • Production
    • Ground support
    • Load and haul
    • Ventilation
  • Open pit mining
    • Design
    • Drill and blast
    • Load and haul
    • Equipment
  • Basic capital and operating costs
  • Types of mining studies; an understanding of pre-feasibility and feasibility studies
  • Mine planning; optimisation, scheduling, cut-off grades
  • Mine closure and rehabilitation
  • Planning parameters and key terminology

Videos and animations are incorporated into the training day to provide visualisation of the mine cycle and enhance the learning experience for your personnel.

The videos and animations cover:

  • Block-cave modelling
  • Cut and fill stoping
  • Sub-level stoping
  • Room and pillar mining
  • Drilling and blasting for both open-pit and underground mining
  • Montage on open-pit mining
Who should attend?

Designed for non-miners working in, associated with or investing in the mining industry.

Course Length (Days)
1

Show the next months in

Level 1, 130 Stirling Street Perth Australia 6000
Level 1, 130 Stirling Street Perth Australia 6000
Level 1, 130 Stirling Street Perth Australia 6000
Location Dates Price exc. Taxes   Status
Perth 05 Feb 1,690.00 AUD

Perth

05 Feb

1,690.00 AUD exc. Taxes

 

Register Now »
Perth 28 Jun 1,690.00 AUD

Perth

28 Jun

1,690.00 AUD exc. Taxes

 

Register Now »
Perth 11 Dec 1,690.00 AUD

Perth

11 Dec

1,690.00 AUD exc. Taxes

 

Register Now »
There are no future events scheduled at this time.